Well I promised to post some pictures of the back yard (garden for all you British folks) when it was finished.
The work took just over 4 weeks through some incredibly hot weather. It was over 100°F on some days (38°C) so we kept an ice cooler full of drinks and snacks available for the guys.
The first week was spent prepping and marking out the garden, the second and third was putting down all the pavers adding the irrigation and lighting and the fourth was rock, plants, grass and mulch.
It’s funny, when you see the plans and then look out onto the mud pit (that it once was), you couldn’t really imagine that everything would fit, but I have to say the designer did an amazing job and the contractors who built it followed the plans perfectly.
To say we are delighted and love the garden would be a huge understatement.
We’ve had a couple of BBQ’s already, and there’s still a couple of warm months left so plenty of time for more.
Anyway, here are some pics from the entrance to the garden through to the other side.